Built for clearer isolation design
Design from drawings. Review with context. Hand over field-ready outputs.
Why we exist
On a mine site, isolation errors often come from fragmented information: a redlined PDF, copied spreadsheets, and a P&ID revision that changed after the plan was treated as final.
Isolation planning is an operational control. IsoBuilder keeps isolation design anchored to the drawing, reviewable by the right people, and traceable from first markup to final sign-off.
The goal is to reduce rework, tighten the handover between planning and execution, and make change obvious before it becomes a problem.
Meet the team
Aaron, Managing Director. Jack, Principal Software Engineer. James, Software Implementation Consultant.
What we mean by Isolation Design
- Define isolation intent on the P&ID.
- Capture the details required for execution.
- Generate consistent isolation outputs.
- Control drawing and scope changes.
Built around the way shutdowns actually run
IsoBuilder supports remote teams, tight windows, changing scope, structured reviews, controlled approval, and field-ready handover.